thanks to the re-entrant winter I am today not be so quite got away from Hamburg - but, Mr. Oehlers and I found a creative solution - while Mr. Oehler's already on site ( and I still on the train) was, we have resolved the outstanding issues on the phone - supi. Then I was the driver of Mr. Oehlers kindly brought to Radbruch of Winsen, so I could make a picture about the current construction site behind it. With the two publishers for insulation and underfloor heating I also totally understand and have a good (as expected) length journey begun conditions (old) home.
|
| and the gaps are Dämmkügelchen .. |
|
| shower tray EC |
|
| floor construction |
|
| hallway and child 1 upstairs |
|
| BATHTUB ;-) |
|
| Child 1 |
|
| care, low (f) lying Perch |
0 comments:
Post a Comment